Drying, recoat and cure planner

Choose your primer and topcoat type, the number of coats and how warm the room is. Get a dated timetable from first coat to full cure.

Products
Conditions
Measure where the doors dry, not the warmest room.
Humidity

Your schedule

Results appear here as you type.

How this is calculated

The planner starts from typical data-sheet times at 20 °C and normal humidity, then scales them for temperature using a common rule of thumb: drying time roughly doubles for every 10 °C drop and halves for every 10 °C rise. High humidity adds 40% for waterborne paint and 15% for oil-based; a dry, heated room takes 10% off.

Base times at 20 °C
ProductTouch dryRecoatRehangLight useCure
Waterborne primer1 h3 h
Shellac primer15 min45 min
Solvent bonding primer1 h4 h
Waterborne topcoat1 h4 h24 h3 days14 days
Oil-based topcoat6 h16 h48 h5 days28 days

The schedule adds 30 minutes after the primer for denibbing (light sanding and dust removal). The temperature multiplier is 2^((20 − T) ÷ 10). At 10 °C it is 2.0, at 15 °C about 1.41, at 25 °C about 0.71.

Worked example

Waterborne primer and two waterborne topcoats at 20 °C, starting 9:00 on Saturday: primer 9:00, denib 12:00, topcoat 1 at 12:30, topcoat 2 at 16:30, rehang from 16:30 on Sunday, light use from about 16:30 on Tuesday, full cure around two weeks later.

Limits

See also: drying vs curing and the example five-day plan.